Rear Brakes are finished and Stainless Steel Brake Lines are installed.
The doors are returned from paint and installed with non rusting hinges and Stainless Steel Hardware.
First of the carpet is installed.
The seats are removed and sound proofing is installed. The doors are test fitted and then will be removed and sent to paint. Then sound proofing will be installed to the inside of the doors. Under dash A/C will go in next
The Heater box is installed along with SSteel Brake lines and Air craft standard SSteel Fuel lines. The Rear Tub Is installed along with seat boxes and floor. New Exmoor Seating including the rear Jump Seats are installed for test fitting. The Rear Qtrs are fitted along with internal roll cage components. Roof and Wind shield frame are installed.
The Seats are being removed and sound proofing installed in the next couple of days.